For MNOs running 2G/3G core elements

Modernise your 2G and 3G core without rebuilding the network

Your HLR, MSC and STP hardware is reaching end of life, and the tier-1 renewal quote assumes you rebuild everything at once. There is a staged path that keeps the network running.

AMTP · 2G/3G Core Elements
HLRSubscriber register, standard interfaces
GMSCGateway switching, inbound routing
SCPIN service logic for prepaid & VAS
STPSS7 signalling consolidation
Standard SS7 / SIGTRANStaged rolloutOPEX or CAPEX

Ouroboros team has the perfect command of value-added services. We are pleased to enjoy a very high level of technical discussions and simple relationships with an available team and a great flexibility in solutions and process.

Philip Morel

IT Solutions Manager · Salt Mobile SA

01

You run a working network. The problem is the hardware underneath it. Spares for legacy HLR and MSC nodes are getting harder to source, support contracts are being repriced, and the original vendor's renewal quote assumes a full forklift upgrade: new hardware, an 18-month programme, and a contract sized for a tier-1 operator.

You do not need a new network. You need to replace the elements that are aging, on standard interfaces, without disrupting the parts that still work — and whatever you put in should carry you toward 4G and 5G rather than locking you into another generation of single-purpose hardware.

02

The AMTP platform covers 2G through 5G, and the core elements you need to replace are available individually. Each one drops into your topology on the same SS7, SIGTRAN and MAP interfaces your existing network already speaks, and talks to the legacy nodes you are keeping. A staged migration, on your schedule, with the network live throughout.

The elements run virtualised on COTS servers, VMware, KVM, or your existing cloud. The same platform holds the 4G and 5G functions, so the HLR you deploy today shares subscriber data with the HSS and UDM you add later. OPEX rental or CAPEX licence.

Man-years of R&D
04Why Ouroboros

Staged element replacement on standard interfaces one node at a time, no rip-and-replace.

02

One platform from 2G to 5G: 3GPP up to release 19, 378 man-years of R&D.

03

Proven with operators you can check: Salt Mobile, STC, Orange, Maroc Telecom.

If your HLR or MSC hardware is approaching end of life and the renewal quote assumes a full rebuild, the better conversation is which element to replace first and how to sequence the rest. Tell us what you are running today and we will map the staged path, including where 4G and 5G fit. Bring the renewal quote if you have one.